Projects / Public references

Retail electrical delivery across generations of major projects.

TEC's current website does not publish detailed case studies, so this page only includes project references that can be tied to TEC's own public updates or dated independent coverage.

Discuss your project
Current + archive

Source-backed project references.

The latest public company update is shown alongside older project references to demonstrate history without presenting archival work as current.

01
Apr 2024 – Oct 2025Chatswood, NSW

David Jones — Chatswood Chase

TEC's public LinkedIn update states that the project was delivered in two phases from concept and detailed design through final commissioning for the new David Jones luxury retail experience at Chatswood Chase.

Type
Retail / Design & Construct
Scope
Electrical, data, communications and security D&C
Collaboration
Multiplex (Base Build) + Mainbrace (Fit-out)
TEC LinkedIn — public company update
02
2001 archiveAdelaide, SA

David Jones — Adelaide Central Plaza

A 2001 Live Design feature credits Total Electrical Connection and Wayne Wa with collaboration on the 25,200 m² David Jones Adelaide flagship lighting program from specification through installation.

Type
Retail / Lighting
Scope
Lighting collaboration from specification through installation
Collaboration
Integrated Lighting Concepts + project design team
Live Design — historical project feature
03
2021 archiveSydney, NSW

David Jones — Christmas Campaign

Public project commentary from Dashing credits TEC as a collaborator on a David Jones Christmas campaign that received Gold recognition at the 2021 Sydney Design Awards.

Type
Retail Event / Collaboration
Scope
Electrical collaboration on a recognised retail campaign
Collaboration
Dashing + Weir Phillips + Ethos Urban + 3Fold
Public LinkedIn project commentary
Recent public update

David Jones Chatswood Chase: end-to-end design & construct.

TEC's public LinkedIn update states that the project ran in two phases from April 2024 to October 2025 and included electrical, data, communication and security design & construct.

TEC also names Multiplex for Base Build and Mainbrace for Fit-out, and describes its role from concept and detailed design through final commissioning.